18 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Aquatic and Marine Environmental Studies Related to Barge-Based Facilities in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005
Summary: This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...


2005 Winter and Spring Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


2004 Aquatic Studies Related to Optional Barge Based Facilities in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. An option of the field...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Within the Gwich'in Settlement Area.
Principal Investigator: Collard, Tod
Licensed Year(s): 2001
Summary: The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...


An Aquatic Effects Study for the Ferry Crossings near Tsiigehtchic and Ft. McPherson, NT
Principal Investigator: Parlee, Brenda L
Licensed Year(s): 2002 2001
Summary: The Aquatic Effects Study will include the general components of fisheries, water quality, river hydraulics, ferry landing operations, and traditional knowledge (TK). The specific Study objectives are as follows: (1) Complete an assessment of fish habitat quality including photographs; (2) Determine which fish species utilize the area; (3) Collect Gwich'in TK in relation to fish and fish habitat. ...


Licence #2459
Principal Investigator: Smith, Daniel W.
Licensed Year(s): 1979
Summary: To sample treated and untreated domestic water supplies for physical and chemical analysis, (e.g. turbidity, color, temperature and trace elements analysis, e.g. lead, zinc, silver and cadmium)....


Licence #2041
Principal Investigator: Chambers, Melvin D.
Licensed Year(s): 1976
Summary: 1) Measurement of water quality indicators. 2) Descriptive measurement of selected physical characteristics of water bodies. 3) Aquatic studies near proposed gas plant site. 4) Studies of selected avain populations in the area....


TOTAL PAGES: 2