Principal Investigator:Evans, Marlene S. Licensed Year(s):2009
2008
20072006 Summary:
This licence is issued for the scientific research application # 835.
This research will examine lakes possibly affected by the proposed Mackenzie Gas Project pipeline, and lakes that can serve as future control/reference sites. Measurements of nutrients and metals in lake water and sediments, lake water quality (DO, pH, conductivity, etc.), and benthic invertebrate and plankton abundance/spec...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits.
All of the aquati...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
20042003 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...