Principal Investigator:Evans, Marlene S. Licensed Year(s):200920082007
2006
Summary:
While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relatively comprehensive in describing the major physical-chemical features of the aquatic environment, they are lacking in the descriptions of the biological features of these environments, and as a consequence, their s...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits.
All of the aquati...