Principal Investigator:Evans, Marlene S. Licensed Year(s):200920082007
2006
Summary:
While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relatively comprehensive in describing the major physical-chemical features of the aquatic environment, they are lacking in the descriptions of the biological features of these environments, and as a consequence, their s...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...