Principal Investigator:Noble, Bram F Licensed Year(s):
2018
20172016 Summary:
This project will determine what information Regulators require about cumulative effects or conditions in order to make informed decisions regarding development impacts to water quality in the NWT, and whether and how that information is, or can be, provided through NWT Cumulative Impacts Monitoring Program (CIMP) or other agencies responsible for monitoring.
The objectives are as follows:
1)...
Principal Investigator:Moore, Jonathan Licensed Year(s):
2018
2017 Summary:
The objective of this research is to establish a community-based monitoring program in the Peel River watershed, based in Fort McPherson.
Previous research has shown that multiple whitefish ecotypes (non-anadromous, semi-anadromous and anadromous, utilize the Peel River as spawning habitat, but it is unclear how much each ecotype contributes to harvester catches. As different ecotypes occupy d...
Principal Investigator:Smith, Lisa Licensed Year(s):
2005
Summary:
The Permanent Monitoring Plots will provide experimental data on forest growth and progression, cumulative impact monitoring, and will provide data for territorial and national reporting requirements.
Most plots will be accessed only by helicopter. At each site, a 400 square metre plot (11.28 m radius) will be established with rebar as a centre post. All trees, shrubs and other vegetation will...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Gwich'in Social and Cultural Institute (GSCI) will conduct the study in the GSA as a subcontractor to the Mackenzie Project Environment Group. The study will proceed under the gui...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Community Corporations in each of Aklavik, Inuvik, and Tuktoyaktuk will be a sub-contractor to the MGP and be responsible for collecting and documenting TK during the project. ...
Principal Investigator:Mills, Hal Licensed Year(s):
2002
2001 Summary:
There are a number of specific tasks for the Aquatics Effects Study at the ferry landings. The research team will complete an assessment of fish habitat quality. They will determine which fish species utilize the area, collect Gwich'in Traditional Knowl...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...