Principal Investigator:Land-Murphy, Brook Licensed Year(s):
2008
Summary:
The objectives of this research project are to gain a greater understanding of the nature and scope of aboriginal participation in the JRP for the Mackenzie Gas Project, and of the factors that hindered or enabled individual aboriginal peoples of the northern Mackenzie Valley to participate in the environmental assessment for this project.
An archival search of government documents, industry st...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary foc...
Principal Investigator:Fabijan, Michael F Licensed Year(s):
2004
2003 Summary:
This study will focus on collecting information from Inuvialuit elders and harvesters, both male and female. 20-25 members from each community will be interviewed. The area of concern will be the lease area (EL 420) and adjacent lands, including Pelly Is...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...