Principal Investigator:Kustan, Ed Licensed Year(s):
2004
Summary:
The purpose of this monitoring program is to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of eight permanent sampling transects were established along the pipeline right-of-way; two in...
Principal Investigator:Ferguson, Gordon Licensed Year(s):
2003
2002 Summary:
This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....