Principal Investigator:Kustan, Ed Licensed Year(s):
2005
Summary:
The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
2004 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Ferguson, Gordon Licensed Year(s):2003
2002
Summary:
A total of eight permanent sampling transects will be established along the pipeline right-of-way; two in each of the four dominant representative vegetation habitats. Site-specific evaluations at each transect will measure re-vegetative success using ve...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...