5 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Extreme Flooding Events in the Mackenzie River Basin
Principal Investigator: de Rham, Laurent
Licensed Year(s): 2004
Summary: It is known that extreme flood levels within the Mackenzie River Basin are caused by ice jamming events. Analysis of open water versus ice influenced water levels at several sites within the Mackenzie River Basin will provide further quantification of th...


Distributed Snowmelt Modelling for Flood Forecasting in Northern Rivers
Principal Investigator: Soulis, E.D. (Ric)
Licensed Year(s): 1992
Summary: The purpose of the project is to improve the ways we have to predict the spring floods in the smaller rivers. Floods from snowmelt are a particular concern in northern rivers. In the Ft. Simpson area, spring flows from the smaller rivers, which are tributaries to the Liard and Mackenzie, have a great deal to do with the timing and nature of breakup on the major rivers. Snow conditions will be surv...


Northern Hydrology and Climatology Studies
Principal Investigator: Prowse, T.D.
Licensed Year(s): 1990
Summary: Spring breakup in Northern Rivers are often associated with record water levels and often lead to flooding. Present methods of forecasting the severity of these events are hampered by lack of understanding. The acquired knowledge and understanding obtained from these studies will be applied to the enhancement of suitable models for predicting the time and magnitude of these events....


Licence #2543
Principal Investigator: Sherstone, D.A.
Licensed Year(s): 1980
Summary: To conduct aerial photography surveys to identify ice jams with resultant flooding. To conduct aerial photography to identify potential non-Mackenzie Valley pipeline routes. To obtain water samples to determine sediment loads carried by the river at various times and locations....


Licence #2513
Principal Investigator: Gill, Don
Licensed Year(s): 1979
Summary: To collect samples of soil and vegetation to assess the ecological importance of the spring flood and downstream importance of hydroelectric developments....


TOTAL PAGES: 1