4 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

In-Stream Turbines for N'dulee Crossing Ferry Camp
Principal Investigator: May, Glenn
Licensed Year(s): 2010
Summary: The objectives of this study are: 1. To evaluate the use of hydrokinetic power generation in the Northwest Territories for use in off-grid applications, 2. To demonstrate cost-savings and reduction of greenhouse gas emissions power for a ferry camp (N'dulee Crossing, about 80 km WNW of Fort Simpson on the way to Wrigley), 3. Based on the results of the N'dulee crossing operation in 2010, evalua...


Northern River Ice Regimes
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1993 1992 1991 1990 1988
Summary: Ice gauges are installed on river ice once the ice is strong enough to support researchers (20 gauges for the Mackenzie Delta and 15 gauges for Hay River). These gauges are read every 10 days to obtain total ice thickness, white ice thickness and snow depth. From these data, the rates of ice growth and decay can be calculated, and the approximate date of maximum ice thickness can be determined....


Licence #2539
Principal Investigator: McCart, Peter
Licensed Year(s): 1980
Summary: As part of the Slave River Hydro Study to conduct a continuing assessment of the fisheries resources of the area. life histories of the fish populations will be recorded. Basic data will be gathered on the aquatic habitat. The resource will also be evaluated as to its local, regional and national significance....


Licence #2513
Principal Investigator: Gill, Don
Licensed Year(s): 1979
Summary: To collect samples of soil and vegetation to assess the ecological importance of the spring flood and downstream importance of hydroelectric developments....


TOTAL PAGES: 1