8 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

O-80 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Architecture and Construction Technique in Northern Climate
Principal Investigator: Nadji, Kayhan
Licensed Year(s): 1992 1991
Summary: This research will investigate the relationship between the architectural and technical aspects of buildings and severe northern climate....


Licence #2449
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


Licence #2284
Principal Investigator: Grey, Bryan J.
Licensed Year(s): 1978
Summary: 1. To obtain relative sediment loadings in the Liard River and the Mackenzie River above and below its junction with the Liard. 2. To measure spring and summer flow patterns in the Liard River at several sites along the propsoed Liard higway....


Licence #2193
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1977
Summary: To conduct snow melt and run-off analysis to determine appropriate highway bridge and culvert design and to determine their effects on fish migration....


Licence #2135
Principal Investigator: McKinnon, G.
Licensed Year(s): 1977
Summary: To assess the short and long term effects of highway construction on the aquatic resources of three streams....


TOTAL PAGES: 1