2 Dossier(s) trouvé(s) pour le chercheur principal "Uren, Shane" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Aquatic and Fisheries Assessments for a Minimum Flow Threshold for Trudel Creek
chercheur principal: Uren, Shane
Année(s) de permis: 2007 2006
Résumé: The objective of the proposed work is to collect information on the fish community and fish habitat present in Trudel Creek, and identify the possible positive and negative impacts of reducing flow into the creek if the Taltson Hydro Project is expanded. The field survey of the fish habitat and community of Trudel Creek and a section of the Taltson River will take place in spring, with the poss...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
chercheur principal: Uren, Shane
Année(s) de permis: 2004
Résumé: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


TOTAL PAGES: 1