2 record(s) found for principal investigator "Zawacky, Summer" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Combined Phase I/II Environmental Site Assessment of Ten Sites; Norris Lake Gold Exploration Site, River Lake Portage Dump, Wijinnedi Lake Exploration Site, Martin House Fuel Cache, Pine Point Railbed
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2012
Summary: The objective of this study is to complete comprehensive site investigations at each location (10 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will f...


Combined Phase I/II ESAs for Five Sites
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2010
Summary: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


TOTAL PAGES: 1