3 record(s) found for principal investigator "Hawkins, Jim" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006-2007 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be performed by...


2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


2006 - 2007 Biophysical and Reconnaissance Studies in the Gwich’in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be by helicopte...


TOTAL PAGES: 1