2 record(s) found for principal investigator "Robinson, Cindy" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Reclamation Research and Closure Plan for Pine Point
Principal Investigator: Robinson, Cindy
Licensed Year(s): 2020 2019
Summary: In accordance with the Mackenzie Valley Land and Water Board (MVWLB) Guidelines, the overarching closure goal for former mine sites is to return the site and affected areas to viable, and wherever practicable, self-sustaining ecosystems that are compatible with a healthy environment and with human activities. To meet this closure goal, companies must demonstrate that a site is physically stable, c...


Environmental Investigations for Reclamation Planning at the Tundra Mine
Principal Investigator: Robinson, Cindy
Licensed Year(s): 2004
Summary: This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...


TOTAL PAGES: 1