Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....