Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of traditional knowledge (TK) studies in the Fort Simpson area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. In 2004, Nogha Geomatics was a subcontractor to the MGP and local researchers were hired to undertake study tasks. Since December 2004, project management in Fort Simpson has shifted to the Liidli...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Trout Lake region which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary foc...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus o...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...