Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...