5 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Summer Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...


2003 Summer Baseline Noise Monitoring Study in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


TOTAL PAGES: 1