16 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Winter and Spring Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


2003 Winter Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...


2003 Winter Aquatic Surveys in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...


2003 Winter Aquatic Surveys in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...


2002 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....


2002 Route and Site Selection in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...


2002 Aquatic Studies in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...


2002 Terrestrial Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Inuvialuit Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon pl...


2002 Route and Site Selection in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


TOTAL PAGES: 2