18 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Route and Site Selection in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...


2002 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to...


2002 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...


2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


TOTAL PAGES: 2