Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Povey, Andrew Licensed Year(s):2003
2002
Summary:
The baseline noise monitoring program in the Inuvialuit Settlement Region will focus on the collection of baseline noise data in the Niglintgak, Parson's Lake and Taglu leases. These are locations where there is the potential for noise during the drillin...