Principal Investigator:Povey, Andrew Licensed Year(s):
2005
2004 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Inuvialuit Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon pl...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...