The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities in the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification...