2003 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities in the pro...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Spring, Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


2003 Winter Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Aquatic Surveys in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...