Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits.
All of the aquati...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...