5 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Summer Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


2003 Winter Aquatic Surveys in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...