Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
This project is a continuation of socio-economic and traditional knowledge studies in the Deh Cho Region, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-economic...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
This project is a continuation of socio-economic and traditional knowledge studies in the Sahtu Settlement Area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project is a continuation of socio-economic and traditional knowledge studies in the Inuvialuit Settlement Area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the soc...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Povey, Andrew Licensed Year(s):2003
2002
Summary:
The baseline noise monitoring program in the Gwich'in Settlement Area will be located at the proposed location of the potential gas compression facilities near Inuvik. The collected data will provide background estimates of ambient noise. This informatio...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The focus of these studies will be to identify, collect, and verify existing socio-economic baseline information, including the local/regional wage and subsistence economies, population, labour force, community facilities, services, accommodation, local/regional infrastructure, community health, wellness and social indicator data. Most information will be collected from secondary sources. Commun...