6 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team. Air calls from a helicopter will be used to map ...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Route and Site Reconnaissance in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


TOTAL PAGES: 1