Principal Investigator:Dares, Matthew J Licensed Year(s):2020
2019
2018 Summary:
The objective of this wind monitoring proposal is to develop further insight into the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependent on gas-electric generation.
A 60 m meteorological tower will be installed in September 2018. This tower is equipped with both heated and unheated anemometers and wind vanes at 40 m, ...
Principal Investigator:Dares, Matthew J Licensed Year(s):202220212020
2019
2018 Summary:
The objective of this wind monitoring proposal is to continue to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) until the site is next serviced and the equipment removed. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. Sensors are already in...
Principal Investigator:Trimble, Annika EV Licensed Year(s):
2017
20162015 Summary:
The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):20102009
2008
2007 Summary:
The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells.
This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...