2 record(s) found with the tag "water velocity" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


Licence #1947
Principal Investigator: Serson, Harold
Licensed Year(s): 1976
Summary: 1) To conduct a study of water quality, volume, heat, and salt transport through Fury and Hecla Strait, 2) Resurvey ablation stakes on the Ward Hunt ice shelf, ice rise and the small ice cap north of St. Patrick's Bay, 3) Oceanographic measurements in Disraeli Fiord and at small halocline lake S.W. of Ward Hund Island, 4) Pre...


TOTAL PAGES: 1