Principal Investigator:English, Michael C Licensed Year(s):
2001
Summary:
The research team will be based in Ft. Resolution. Transportation includes aircraft from Toronto to Edmonton to Hay River. Transportation in the field will be by truck and boat. The research team will operate from a base camp previously established on Steamboat Channel (a camp we originally established in 1977 when this work originally started). Water level recorders will be established at six sit...
Principal Investigator:Grabke, Dan Licensed Year(s):
2000
Summary:
In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...
Principal Investigator:English, Michael C Licensed Year(s):
2000
19961995 Summary:
The field crew will live on the delta for approximately 8-9 weeks at a site established by the principal investigator in 1997 on Steamboat Channel. Transportation will be by boat. Three channels will be studied in detail. At each study site the researchers will measure the speed of the flow using an electronic velocity meter, measure the cross sectional profile of the channel with tape and rod ...