Principal Investigator:Nearing, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5047.
The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...
Principal Investigator:McLean, Sarah C Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4858.
The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area.
Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):
2013
201220112010 Summary:
The objective of the 2013 Great Slave Lake Mines Sampling Program is to assist Aboriginal And Northern Development Canada-Contaminants And Remediation Directorate (AANDC-CARD) with its ongoing work to clean up abandoned mine sites across the Northwest Territories. The program aims to collect additional environmental data which will be used to confirm current site conditions and to assist with fina...
Principal Investigator:Winch, Susan Licensed Year(s):
2012
Summary:
The objective of this research project is to conduct Phase II Environmental Site Assessments (ESAs) at six locations located within the Northwest Territories (NT). The purpose of field investigations at Caribou Point, Crestaurum Mine, Sun-Rose Claim Group, Thompson-Lundmark Mine, Wrigley Point, and Dome Lake is to determine the current environmental and physical conditions at each site and to red...
Principal Investigator:Trusler, Scott Licensed Year(s):
2012
2008 Summary:
The objectives of the research studies are the following: refine understanding of baseline conditions; provide input to design mitigation; evaluate potential changes in the environment in relation to the Izok Project; and contribute to the ongoing data collection of the Arctic environment.
The Minerals and Metals Group (MMG) Canada team of environmental consultants will collect and review exist...
Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...
Principal Investigator:Maier, Kris Licensed Year(s):
2010
Summary:
This is a community-driven collaborative project. The Gwichya RRC is the project manager. The community asked for this research to be completed and the GRRB and ENR are providing logistical and technical support. All hiring will be done in the community to maximize community involvement and benefits.
The goals of this study are to:
1) Collect baseline vegetation data in habitats around Travai...
Principal Investigator:Miller, Glenn D Licensed Year(s):
2008
Summary:
The objective of this research is to identify and document valued vegetation components in the vicinity of proposed winter activities. Each selected site will be assessed for important vegetation components, such as the potential for: rare plants and vegetation communities. The research will include photo documentation and visual observations to characterize each site for vegetation features. Inf...
Principal Investigator:Maaskant, Shirley Licensed Year(s):2009
2007
Summary:
This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2006
Summary:
Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik.
The field assessment will involve four s...