2 dossier(s) trouvé(s) portant l’étiquette "geological timeline" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Central Foreland NATMAP Project
chercheur principal: Lane, Larry S
Année(s) de permis: 2002 2001 2000
Résumé: The research team will resume mapping bedrock and surficial geology at 1:50,000 and 1:250,000 scales, continuing a project begun in the summer of 2000. The base of operations will be either at Fort Liard, or at an existing base camp on the southeastern La Biche River. Fly camps will be accessed by helicopter. Fly camps will be visited by 2-4 crew members for about 1 week. From the fly camps the ...


Licence #5112
chercheur principal: Osadetz, Kirk
Année(s) de permis: 1985
Résumé: To determine the latitude of the Arctic Islands through geologic time using the paleomagnetic technique: describe, measure and sample (hand samples) Mesozoic volcanic rocks to determine their paleolatitude....


TOTAL PAGES: 1