2 dossier(s) trouvé(s) portant l’étiquette "geological timeline" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Central Foreland NATMAP Project
chercheur principal: Lane, Larry S
Année(s) de permis: 2002 2001 2000
Résumé: The research team will resume mapping bedrock and surficial geology at 1:50,000 and 1:250,000 scales, continuing a project begun in the summer of 2000. The base of operations will be either at Fort Liard, or at an existing base camp on the southeastern La Biche River. Fly camps will be accessed by helicopter. Fly camps will be visited by 2-4 crew members for about 1 week. From the fly camps the ...


Thematic structural stratigraphic, and geochronological studies of the Slave structural province.
chercheur principal: Bleeker, Wouter
Année(s) de permis: 2000 1999 1998 1997 1996 1995 1994
Résumé: Map and describe the various rock types and assess their role in the complex geological history of the Slave Province. Fly-in / fly-out camps with small airplanes and small campsites to make daily traverses by boat or foot to study the local rocks. Small samples will be taken of interesting rocks; samples are fist sized....


TOTAL PAGES: 1