Principal Investigator:Morrison, Scott Licensed Year(s):20072006
2005
2004 Summary:
Consistent with the DFO authorization, the major objectives of the study are to provide annual documentation of shoal habitat use by Lake Trout in the vicinity of the mine site, and to ground truth hydroacoustic equipment.
Study locations for 2005 are as per 2004. Hydroacoustic surveys are to be conducted during the early morning or evening hours. The survey is conducted at the same time each...
Principal Investigator:Sutor, Greg Licensed Year(s):
1997
Summary:
Vegetation communities along the pipeline route and over other parts of the Project area would be provisionally mapped from aerial photographs. A field survey would be undertaken with an emphasis on identifying rare plants. The study area is in the Caribou Hills IBP site 4-9, which was in part proposed because of its rare flora. July is an optimum time for a single survey. Also transect sampling ...