3 dossier(s) trouvé(s) portant l’étiquette "environmental responsibility" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Modified Phase II Environmental Site Assessment O-35 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003
Résumé: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003
Résumé: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Environmental Baseline Study for the Thor Lake Beryllium Project
chercheur principal: Digel, Mark
Année(s) de permis: 1998 1997
Résumé: Water quality field work involves drilling with an ice auger on four small lakes in the Den Lake watershed to determine if water is present below the ice, and if so, the depth of the water. The concentration of dissolved oxygen will be measured to determine the lake's potential to support overwintering fish. The results of this late winter survey will be used to identify the need for further fishe...


TOTAL PAGES: 1