Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits.
All of the aquati...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
20042003 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
20042003 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
2004 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Armstrong, Allison Licensed Year(s):
2003
Summary:
The Mackenzie Valley Land and Water Board has authorized the discharge of a small amount of water through an experimental water treatment system. This system sprays water into the air and onto the tundra. It is anticipated that the water that is discha...
Principal Investigator:McEachern, Laurie Licensed Year(s):
2003
2002 Summary:
To assist with current environmental management of the Kennady Lake or Gahcho Kue Project (an advanced mineral exploration property operated by DeBeers Canada Exploration Inc.), and to prepare for an assessment of environmental effects of potential futur...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....