2 record(s) found with the tag "environmental impact" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


Highway #3 Reconstruction, Preferred Alignment Fisheries Habitat Assessments
Principal Investigator: Thomas, Craig J
Licensed Year(s): 1998
Summary: This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...


TOTAL PAGES: 1