29 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Assessment of Stream Crossings for Planned Improvements to the Mackenzie Valley Winter Road.
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...


Paleontology and sedimentology of Late Proterozoic Little Dal Reefs, Mackenzie Mountains, NWT.
Principal Investigator: Turner, Elizabeth C
Licensed Year(s): 2001 1999 1998 1996 1994 1992 1991 1989 1988
Summary: Two people will be transported to the field sites via helicopter from Norman Wells. All ground work is done on foot. Data collection involves photography of rock outcrops, measurement of stratigraphic sections using a tape measure, description of outcrops, and selective sampling of about 100 fist-sized rock samples using a geological hammer....


Architecture and Construction Technique in Northern Climate
Principal Investigator: Nadji, Kayhan
Licensed Year(s): 1992 1991
Summary: This research will investigate the relationship between the architectural and technical aspects of buildings and severe northern climate....


Licence #2284
Principal Investigator: Grey, Bryan J.
Licensed Year(s): 1978
Summary: 1. To obtain relative sediment loadings in the Liard River and the Mackenzie River above and below its junction with the Liard. 2. To measure spring and summer flow patterns in the Liard River at several sites along the propsoed Liard higway....


Licence #2193
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1977
Summary: To conduct snow melt and run-off analysis to determine appropriate highway bridge and culvert design and to determine their effects on fish migration....


Licence #2135
Principal Investigator: McKinnon, G.
Licensed Year(s): 1977
Summary: To assess the short and long term effects of highway construction on the aquatic resources of three streams....


Licence #2005
Principal Investigator: McKinnon, Greg
Licensed Year(s): 1976
Summary: To assess the short and long term effects of highway construction on the aquatic resources of three streams....


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


Licence #1824
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1975
Summary: Measurement of peak stream flows and assessment of environmental conditions at stream crossings along the Mackenzie Highway....


TOTAL PAGES: 3