3 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Long-term ecological and geomorphological investigations in the alpine tundra of the Mackenzie Mountains, NWT
Principal Investigator: Mamet, Steve D
Licensed Year(s): 2023 2022 2021 2020 2019
Summary: This licence has been issued for the scientific research application No.5282. Objectives of this research project are to determine: 1) the status of permafrost landforms; 2) long-term recovery after abandonment of the CANOL No. 1 project, including oil spills and gravel pits; and, 3) the status of treeline. The research team will be examining the permafrost by thaw depth probing, and automat...


Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2023 2022 2021 2020 2019
Summary: This licence has been issued for the scientific research application No.5181. The combined temperature and active layer monitoring network extends from Fort Simpson to the Arctic Coast. With monitoring instrumentation already in place through work under previous licenses, the main work of this phase will be data collection. While different parts of the network can be visited at different times ...


Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project combines the ongoing monitoring program of the same title (Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT) and the activities previously undertaken by the project title, “Active Layer Monitoring Network in the Mackenzie Valley”. The objectives of this study are to provide baseline knowledge of permafrost and terrain condit...


TOTAL PAGES: 1