Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2009
2008 Summary:
Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...
Principal Investigator:Digel, Mark Licensed Year(s):1998
1997
Summary:
Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...
Principal Investigator:Nieminen, G.A. Licensed Year(s):
1980
Summary:
To undertake environmental field studies relating tothe environmental assessment of a mine/mill development and a winterd access road. The studies will include fisheries studies, vegetation identification, soil sampling, and wildlife habitat assessment....
Principal Investigator:Bohn, Arne Licensed Year(s):
1980
Summary:
To conduct an assessment of the impacts of new mining and water discharge. The studies will include: - updating information on soil types and vegetation. - updating information on wildlife habitat. - updating information on water quality and fish habitat. - examining background levels of trace metals associated with Pine Point Mining activity....
Principal Investigator:Bohn, Arne Licensed Year(s):
1976
Summary:
1) To sample and describe soils and vegetation at selected sites for heavy metals analysis. 2) To assess the effect of mining activity on wildlife habitat at selected sites. 3) To review the water quality monitoring program covering local streams....