3 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Licence #4000
Principal Investigator: Viren, Tom
Licensed Year(s): 1984
Summary: To install automatic water level gauges at Bell Rock, Brule Point, and one at the bifurcation with the Jean River. Spot water levels will be measured at other points of interest along the river. Measurements of ice thicknesses, water temperatures and flow velocities under the ice will be made....


Licence #2317
Principal Investigator: Bednarski, Jan
Licensed Year(s): 1978
Summary: To study the snow pack including snow density, depth, water equivalence, stratigraphy and ice composition....


TOTAL PAGES: 1