Principal Investigator:Drolet, Andree Licensed Year(s):
2019
Summary:
This licence has been issued for the scientific research application No.4582.
These studies are to support upcoming regulatory applications for the Pine Point Project being developed by Pine Point Mining Limited (PPML).
The additional baseline studies include but are not limited to surface water quality and quantity, groundwater water quality, aquatic environment monitoring, fish and fish ha...
Principal Investigator:Cipcigan, Paul Licensed Year(s):
2014
Summary:
The objective of the groundwater investigation is to confirm the presence or absence of contamination and to determine the risk associated with contaminated groundwater infiltration into the lake (if applicable). This work will include installing five to six monitoring wells at the site in the area adjacent to the Great Slave Lake. A secondary objective is to inspect the fuel storage tanks located...
Principal Investigator:Challen Urbanic, Jane Licensed Year(s):2012
2011
20102009 Summary:
The objective of this research is to assess the performance of lagoons and wetlands in the treatment of municipal wastewater in Canada's Arctic. A secondary objective is to determine the occurrence of trace contaminants in northern wastewaters.
Samples will be taken from the influent (raw sewage) and effluent (treated wastewater) select wastewater systems. Samples will be taken during the perio...