7 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Aquatic and Fisheries Assessments for a Minimum Flow Threshold for Trudel Creek
Principal Investigator: Uren, Shane
Licensed Year(s): 2007 2006
Summary: The objective of the proposed work is to collect information on the fish community and fish habitat present in Trudel Creek, and identify the possible positive and negative impacts of reducing flow into the creek if the Taltson Hydro Project is expanded. The field survey of the fish habitat and community of Trudel Creek and a section of the Taltson River will take place in spring, with the poss...


Environmental Baseline Studies, Tamerlane Ventures Inc., Pine Point Mining Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2005
Summary: The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study. Field s...


Environmental Assessment for Petroleum Exploration, Drilling and Development, Cameron Hills, NWT.
Principal Investigator: Mears, Margaret
Licensed Year(s): 2000
Summary: Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...


Studies on the past, present and future ecological impact on Canadian northern boreal forest and arctic ecosystems due to mining activities, shown at the Great Slave Lake area, Northwest Territories, Canada
Principal Investigator: Steinecke, Karin
Licensed Year(s): 1998 1997
Summary: The project will focus on understanding, analyzing and evaluating the reactions of the northern boreal forest ecosystems in the Great Slave Lake region due to man made stress of mining, settlement and connecting activities. The project will try to develop some general conclusions, statements and model systems. The research team (2 persons) will come from Europe to Yellowknife by plane. The base wi...


Kennedy Lake Wildlife Monitoring and Traditional Sites Identification Project`
Principal Investigator: Poniatowski, Brian
Licensed Year(s): 1998
Summary: The community monitor will carry out monitoring of wildlife, principally caribou, which are of great importance to the Lutselk'e First Nation. This will be done by directly observing their numbers, sex of animals (if this can be determined), age, condition, movements and behaviour in relation to Kennedy Lake camp and to specific worksites, such as sites where drilling or till sampling are being ca...


Licence #5141
Principal Investigator: Spencer, Richard
Licensed Year(s): 1985
Summary: Collect biophysical information for permit applications (water, land use, surface lease)....


Licence #5130
Principal Investigator: Sutherland, David
Licensed Year(s): 1985
Summary: To establish aquatic environmental quality monitoring sites in the vicinity of "OUter Sun Bay" on Contwoyto Lake. The purpose is to monitor the effectiveness of effluent quality limits imposed on Lupin Mine in protecting the receiving aquatic environment....


TOTAL PAGES: 1