Assessing Impacts of Permafrost Degradation on Community Infrastructure Due to Climate Change: Modeling, Simulation and Adaptation Costing
Principal Investigator: Zhou, Fuqun
Licensed Year(s): 2004
Summary: Structural infrastructure in northern communities is dependent on the permafrost layer for stability. The thawing and disappearance of the permafrost layer has accelerated in recent decades, damaging buildings and other infrastructure, and causing public...


Long-term Ecological and Geomorphological Investigations in the Alpine Tundra of the Mackenzie Mountains, NWT
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 2018 2017 2016 2015 2014 2012 2010 2009 2008 2007 2006 2005 2004 2003
Summary: The main study objectives are to: 1) determine the status of permafrost landforms in the study area between Macmillan Pass and Plains of Abraham; and 2) determine the long-term recovery after abandonment of the CANOL No. 1 project. This is part of long-...


Reconnaissance Surveys to Select Sample Sites for Detailed Biophysical Surveys in the Sahtu Settlement Area
Principal Investigator: Green, Jeff
Licensed Year(s): 2001
Summary: The proposed research program will be carried out on Crown Lands located within the Sahtu Settlement Area. The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys on Crown Lands located within the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters...


Licence #2416
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 1979
Summary: To evaluate the impacts of the Canol Project (1942-45) upon the topography and plant communities and to determine the natural rehabilitation of disturbed sites....


Licence #2330
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 1978
Summary: To evaluate the impacts of the Canol Project (1942-45) upon the topography and the plant communities and to determine the rehabilitation of disturbed sites....