Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):2018201720162015201420122010200920082007200620052004
2003
Summary:
The main study objectives are to: 1) determine the status of permafrost landforms in the study area between Macmillan Pass and Plains of Abraham; and 2) determine the long-term recovery after abandonment of the CANOL No. 1 project. This is part of long-...