6 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Population abundance and vital rates of fish harvested from lakes along the Mackenzie Valley pipeline route – Loon Lake 2005
Principal Investigator: Toyne, Melanie J
Licensed Year(s): 2005
Summary: The proposed Mackenzie natural gas pipeline route crosses Loon River, which connects Loon Lake to the Mackenzie River. It is important to collect information on fish species in Loon Lake to compared with after the proposed pipeline is built to determine if any changes have occured. All field crew transported to Loon Lake via North-Wright twin otter floatplane. Crew will set nets to catch fish an...


2005 Spring Break-up Watercourse Investigation Program in the Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...


Surficial Geology Mapping Fort Norman (96C), Blackwater Lake (96B), Mahoney Lake (96F)
Principal Investigator: Duk-Rodkin, Alejandra ADR
Licensed Year(s): 2003
Summary: This project aims to obtain a better understanding of the sensitivity of slopes to disturbance from development, especially in the context of progressive climate warming. It will also identify baseline levels for natural and anthropogenic contaminants,...


2002 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...


Licence #5015
Principal Investigator: Harry, David
Licensed Year(s): 1985
Summary: A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zana pipeline. Fieldwork will focus on investigation of terrain conditions during and subsequent to the 1984-85 winter construction season....


Licence #2449
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


TOTAL PAGES: 1