4 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Population abundance and vital rates of fish harvested from lakes along the Mackenzie Valley pipeline route – Loon Lake 2005
Principal Investigator: Toyne, Melanie J
Licensed Year(s): 2005
Summary: The proposed Mackenzie natural gas pipeline route crosses Loon River, which connects Loon Lake to the Mackenzie River. It is important to collect information on fish species in Loon Lake to compared with after the proposed pipeline is built to determine if any changes have occured. All field crew transported to Loon Lake via North-Wright twin otter floatplane. Crew will set nets to catch fish an...


2004 Winter and Spring Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...


2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...


TOTAL PAGES: 1