4 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


Licence #4124
Principal Investigator: Fairbarns, Matt
Licensed Year(s): 1984
Summary: To choose study sites for work to be done next Spring on investigation of vegetation-permafrost-microclimate relationships associated with subarctic pipeline disturbances....


Licence #4090
Principal Investigator: Harry, David
Licensed Year(s): 1984
Summary: A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 1